Smart City

Kathmandu-Naubise Tunnel Way Design

Detail technical and financial report of ” Kathmandu-Naubise Tunnel Way” has been finalized and the global tender will be called  by December 2017 for the construction. It is going to be built under  loan assistance by Japan government . The total budget for the project is estimated to be 16 billion Nepali Rupees.

 The  2.35 Kilometers tunnel will be completed within 4 years, which will reduce travel time to 20 minutes from an hour or sometimes 3-4 hours due to traffic congestion.

This is going to be a vital development to reduce traffic congestion and assure trouble free travel to Kathmandu from all over Nepal.

The total  road span will be 12 meters wide with 1-1 meter in each for pedestrian. It will be facilitated with mechanical ventilators, Jet Fan, and fire fighters for emergency.

Video prepared by Japanese agency (JICA) about the Tunnel Way

 

Prakash Acharya is an entrepreneur from Nepal, passionately working to substitute fossil fuels with clean energy technologies. He co-founds Mukti Energy, a solar energy company providing a one-stop solution in the sector. He is also a big believer in change so he advocates and works for creating impact in society. His topics of interest spans from sustainability, zero energy, poverty reduction, sociology to smart city. He graduated from Institute of Engineering, Thapathali Campus on Industrial engineering. He is also a former assistant lecturer in IOE, Thapathali . Prakash is a fellow for Social Entrepreneurship Outreach Program 2014, Social Entrepreneurship Forum Sweden.

Leave a Reply

Your email address will not be published. Required fields are marked *

FOLLOW @ INSTAGRAM